Tajima's Advanced Productivity Innovations Improve Efficiency |
|
Machine Information |
Tajima |
Other |
|
Average Trim Time (seconds) |
|
seconds |
|
seconds |
Average Color Change Time (seconds) |
|
seconds |
|
seconds |
Number of Heads (1 - 20) |
|
|
|
|
| Hoop Changeover Time Per Head (seconds) |
|
seconds |
|
seconds |
| Average machine speed (spm) |
|
|
|
|
Design Information |
|
# stitches in the design (1 - 1,000,000) |
|
stitches |
|
stitches |
# color changes in the design (1 - 1,000) |
|
color changes |
|
color changes |
# trims (not including color change thread trims, 1 - 1,000) |
|
trims |
|
trims |
|
|
|
|
|
Production Time |
|
Calculated Sewing Time For One Run (minutes) |
|
minutes |
|
minutes |
Hoop Changeover Time Total (minutes) |
|
minutes |
|
minutes |
Projected Production Time For One Run (minutes) |
|
minutes |
|
minutes |
Unexpected Downtime (percentage, 0 - 100) |
|
% |
|
% |
Realistic Production Time For One Run (minutes) |
|
minutes |
|
minutes |
Runs per hour |
|
|
|
|
Pieces per hour |
|
|
|
|
Pieces per week* |
|
|
|
|
| |
 |
|
 |
|
Percent increase in productivity |
|
%
|
|
|
*Assumes only 35 production hours per week per machine due to job setup downtime, which can easily run 1 hour/machine/job.
|
NOTE: Patented Tajima mechanical processes yield faster color change and trim times. |
NOTE: Special Tajima design features provide easier hoop access, resulting in quicker changeover times. |
|
|
|
|
|
|
|
|
|