faq's

Estimated Machine Output - Tajima VS Other Brands

Tajima's Advanced Productivity Innovations Improve Efficiency

Machine Information

Tajima

Other


Average Trim Time (seconds)

seconds

seconds

Average Color Change Time (seconds)

seconds seconds

Number of Heads (1 - 20)



Hoop Changeover Time Per Head (seconds) seconds seconds
Average machine speed (spm)

Design Information


# stitches in the design (1 - 1,000,000)

stitches

stitches

# color changes in the design (1 - 1,000)

color changes

color changes

# trims (not including color change thread trims, 1 - 1,000)

trims

trims

       

Production Time


Calculated Sewing Time For One Run (minutes)

minutes

minutes

Hoop Changeover Time Total (minutes)

minutes

minutes

Projected Production Time For One Run (minutes)

minutes

minutes

Unexpected Downtime (percentage, 0 - 100)

%

%

Realistic Production Time For One Run (minutes)

minutes

minutes

Runs per hour



Pieces per hour



Pieces per week*



  Calculate >>>   Calculate >>>  

Percent increase in productivity

%


*Assumes only 35 production hours per week per machine due to job setup downtime, which can easily run 1 hour/machine/job.

 

NOTE: Patented Tajima mechanical processes yield faster color change and trim times.

NOTE: Special Tajima design features provide easier hoop access, resulting in quicker changeover times.









 

Contact: Bizzee Bee Embroidery Consultants, Glanakip, Rathcormac, Co Cork, Ireland

 

Telephone: +353 (0)25 36755  E-mail: info@embroidery-europe.com

Login >